Hourly Cost Structure
12 minBuild a shop hourly rate from depreciation, labor, energy, maintenance, overhead, utilization, and margin assumptions.
Read guideLaser guide library
Start
Build shop rate and cost structure first.
Estimate
Run material, cycle time, gas, pierce, setup, and overhead.
Check
Use reference tables to keep assumptions visible.
Export
Capture the result in PDF or worksheet form.
Quote workflow map
Core guides
Build a shop hourly rate from depreciation, labor, energy, maintenance, overhead, utilization, and margin assumptions.
Read guideCollect ownership, power, gas, maintenance, service, downtime, overhead, and utilization inputs before quoting fiber laser work.
Read guideSeparate contract scope, exclusions, consumables, downtime, travel, and warranty overlap before annualizing maintenance cost.
Read guideKeep cut length, feed rate, pierce time, setup, handling, and evidence separate before the time model enters a quote.
Read guideClean DXF and sheet assumptions before using the rectangular nesting model or handing the file to CAM.
Read guideCapture vendor quotes, installation, financing, maintenance, utilities, training, and utilization assumptions before ROI and hourly-rate modeling.
Read guideReview vendor quote, financing, utilization, operating cost, and downside cases before sending the case to the ROI calculator.
Read guideMap the Excel and PDF worksheet fields for material, cycle time, pierce time, setup, gas, overhead, and margin into the full quote calculator.
Read guideRead the unit price from material, time, yield, overhead, and margin before the quote is released.
Read guideBuild the marking cost floor from planning speed, timed sample evidence, hourly cost, and excluded cost items before pricing.
Read guideTrace cost per piece through margin policy, batch scope, reviewer signoff, and quote release evidence.
Read guideAssemble the quote packet from source records, assumptions, and reviewer notes before the price is sent.
Read guideWalk through material, time, pierce, setup, gas, power, overhead, and margin before trusting a quote price.
Read guideDefine the scrap rule, remnant credit, and reuse threshold before the material cost enters the quote.
Read guideChoose machine-hour, labor-hour, material-value, or hybrid allocation before overhead enters a laser quote.
Read guideConvert measured kW, cutting time, auxiliary load, idle time, utility rate, and demand-charge policy into a quote input.
Read guideCompare standard, soft, and ramp piercing choices so high-hole-count jobs carry realistic pierce time and nozzle assumptions.
Read guideUse kerf width, nozzle, thickness, and compensation notes to keep nesting and dimensional allowances consistent.
Read guideEstimate deburring, cleaning, inspection, and packing time so quote totals include real post-cut handling.
Read guideReference tables
These tables cover speed, gas, material, power, kerf, pierce, finishing, and setup assumptions that feed quote calculations.
| Table | Used for | Workflow step |
|---|---|---|
| Cutting Speeds | cycle time and price per meter | Check assumptions before exporting a quote. |
| Assist Gas | gas choice and quote treatment | Check assumptions before exporting a quote. |
| Material Costs | sheet cost and supplier overrides | Check assumptions before exporting a quote. |
| Power Consumption | energy and hourly rate inputs | Check assumptions before exporting a quote. |
| Processing Parameters | shop setup and SOP checks | Check assumptions before exporting a quote. |